•  photo DSC_0346-001.jpg
  •  photo DSC_1169-001.jpg
  •  photo DSC_0906-001.jpg
  •  photo DSC_0009.jpg
  •  photo DSC_0131.jpg
  •  photo DSC_0078.jpg
  •  photo DSC_0063 2.jpg
  •  photo DSC_0436 2.jpg
  •  photo DSC_0066.jpg
  •  photo DSC_0294.jpg
  •  photo DSC_1413_1.jpg

the foyer + hallway

Photobucket
completed:
  • painted walls and trim
  • replaced vent covers and switch plates
one year plan:
  • find perfect table
  • find rug/runner
  • replace lighting
  • paint/re-stain railing
  • design/sew window treatment
three year plan:
  • replace front door
  • replace hardwood floors (at the same time as the entire first level to keep it consistent)
  • replace windows (along with the rest of the house)
and, if we decide to stay in this house for an extended period of time...

ten year plan:
  • refinish railing
  • remove carpet from stairs and replace with wood risers and treads
upstairs hallway

Photobucket
Photobucket

[clockwise l to r: master bedroom, hall/guest room, linen closet, guest bedroom I, guest bedroom II, craft room/future nursery]

Photobucket
Photobucket

I would love to hear your thoughts, recommendations, or critiques!  Comment below or e-mail me.

post signature